New Project for wind energy | Juniper Green Energy

India’s wind energy sector has shown consistent progress. The expansion of the wind industry has stemmed in a strong ecosystem, project operation capabilities and indigenous manufacturing base. The country currently has the fourth highest wind installed capacity in the world with total installed capacity of 39.25 GW (as on 31st March 2021) and has generated around 60.149 Billion Units during 2020-21.

Image

Commissioned Project

70 MW Wind Power Project (Gujarat)

Gujarat, with its vast potential for renewable energy, especially wind and solar, continues to lead the way in implementing clean energy projects As of May 2024, the state boasts an installed wind power capacity of 11.8 GW, contributing to its total renewable energy capacity of 25.9 GW.

In May 2022, Gujarat Urja Vikas Nigam Limited (GUVNL) issued a 500 MW Wind-Phase III Bid, where Juniper Green Energy successfully secured a 70 MW wind power project. A Power Purchase Agreement (PPA) was signed in December 2022, and the project has since been commissioned as of June 2024.

Image

Juniper Green Energy is committed to harnessing the power of wind energy to create sustainable and clean energy solutions. Our project for wind energy are designed to maximize efficiency while minimizing environmental impact, contributing to a greener future. Discover how we are driving innovation in renewable energy through cutting-edge wind technology and strategic project development.

Image

Under-Construction Project

50 MW Wind Power Project (Gujarat)

Gujarat, with its vast potential for renewable energy, especially wind and solar, continues to lead the way in implementing clean energy projects As of May 2024, the state boasts an installed wind power capacity of 11.8 GW, contributing to its total renewable energy capacity of 25.9 GW.

Gujarat Urja Vikas Nigam Limited (GUVNL) issued a 300MW Wind-Phase IV Bid in the Oct 2022. Juniper was a successful bidder in this bid and signed a PPA for 50MW wind power project in May 2023. This project will be developed in the state of Gujarat with a scheduled date of commissioning of Q2 2025.